Download and fill out the application to submit via email or download and print the application to complete and submit in person or by mail.
Operating Permit Assessment Application
Operating permits are a requirement for all septic systems with a significant risk of pollution to ground water or high strength waste. The Goodhue County Septic Ordinance specifically calls out:
Operating Permits are also required for "any other system deemed by the department to require additional oversight". Systems that fall under this category consist of but are not limited to:
In addition to the list above there are some systems that also may require an operating permit depending on their design and construction. Other systems would be Type III (modified soil absorption) where the soil is unnatural material or reduced in size due to limiting conditions.